Project: West Block South East Tower Stabilization Parliament Hill, Ottawa

General Information

Owner: Public Works and Government Services Canada

Architect:  Le Groupe Arcop/Fournier Gersovitz Moss

General Contractor: Tofcon

Contract Type: Lump Sum

Completed: May 2005

Electrical Information

Engineer: Fox Engineering

Bid Closing: Ottawa Valley Bid Depository

Electrical Schedule: On Schedule

Scope of Work

Installation of power and lighting inside steel structure, the power supply 600V from inside the West Block controlled through a contactor and by key switch at entrance of structure. The 600V source transformed down to 120/208V supply’s the power requirements to the electrical panel installed in the steel structure. Branch wiring supplies power and lighting throughout structure.

Project: Health Protection Building #7 300 North Wing Refit Tunneys Pasture, Ottawa

General Information

Owner: Public Works and Government Services Canada

Architect:  Schoeler & Heaton Architects Inc.

General Contractor: Nicolini Construction

Contract Type: Lump Sum

Start Date: December 2003

Electrical Information

Engineer: Wood Banani & Associates Ltd

Bid Closing: Ottawa Valley Bid Depository

Electrical Schedule: On Schedule

Scope of Work

Demolish all electrical panels, lighting, fire alarm, conduit and wire in basement, First, Second and Third Floors. Refit the three floors with new power distribution, lighting, fire alarm, conduit for power and data for new office layouts per floor.

Project: Lester B. Pearson Vehicle Barrier and Traffic Control Gates 125 Sussex Dr., Ottawa

General Information

Owner: Public Works and Government Services Canada

Designer:  Jp2g Consultants Inc.

General Contractor: Prestige Design and Construction

Contract Type: Lump Sum

Start Date: January 2006

Electrical Information

Engineer: Jp2g Consultants Inc.

Bid Closing: To General Contractor

Electrical Schedule: On Schedule

Scope of Work

Installation of power and exterior controls for 6 vehicle barriers and traffic gates.  The work comprised of 600V distribution from main electrical room to the barrier control rooms, transformation to 120/208V to supply distribution panels and supply of conduit and wiring to control panels and vehicle barriers and traffic gates. The use of utilidoors was used to install conduit  to barriers.