Project: West Block South East Tower Stabilization Parliament Hill, Ottawa
General Information
Owner: Public Works and Government Services Canada
Architect: Le Groupe Arcop/Fournier Gersovitz Moss
General Contractor: Tofcon
Contract Type: Lump Sum
Completed: May 2005
Electrical Information
Engineer: Fox Engineering
Bid Closing: Ottawa Valley Bid Depository
Electrical Schedule: On Schedule
Scope of Work
Installation of power and lighting inside steel structure, the power supply 600V from inside the West Block controlled through a contactor and by key switch at entrance of structure. The 600V source transformed down to 120/208V supply’s the power requirements to the electrical panel installed in the steel structure. Branch wiring supplies power and lighting throughout structure.
Project: Health Protection Building #7 300 North Wing Refit Tunneys Pasture, Ottawa
General Information
Owner: Public Works and Government Services Canada
Architect: Schoeler & Heaton Architects Inc.
General Contractor: Nicolini Construction
Contract Type: Lump Sum
Start Date: December 2003
Electrical Information
Engineer: Wood Banani & Associates Ltd
Bid Closing: Ottawa Valley Bid Depository
Electrical Schedule: On Schedule
Scope of Work
Demolish all electrical panels, lighting, fire alarm, conduit and wire in basement, First, Second and Third Floors. Refit the three floors with new power distribution, lighting, fire alarm, conduit for power and data for new office layouts per floor.
Project: Lester B. Pearson Vehicle Barrier and Traffic Control Gates 125 Sussex Dr., Ottawa
General Information
Owner: Public Works and Government Services Canada
Designer: Jp2g Consultants Inc.
General Contractor: Prestige Design and Construction
Contract Type: Lump Sum
Start Date: January 2006
Electrical Information
Engineer: Jp2g Consultants Inc.
Bid Closing: To General Contractor
Electrical Schedule: On Schedule
Scope of Work
Installation of power and exterior controls for 6 vehicle barriers and traffic gates. The work comprised of 600V distribution from main electrical room to the barrier control rooms, transformation to 120/208V to supply distribution panels and supply of conduit and wiring to control panels and vehicle barriers and traffic gates. The use of utilidoors was used to install conduit to barriers.